Good preparation keeps the appointment quick and the price fixed. Below is exactly what needs to be ready before we come for the ISDE package or the ISDE combi package. The complete installation of the appliance is done by an installation company: us, from A to Z. That includes placing or hanging it. Prefer an explanation step by step first? Read Prepare a heat pump yourself.
Checklist
These items are there for your installation: so it is safe, works well and lasts a long time. If everything is ticked off, we are done quickly at the appointment. Your ticks are kept on this device. Booked? Then tick off on your personal page (link in your confirmation): that one counts for your appointment.
Everything ticked off. Great! Send us your photos and we will have a look beforehand.
What you prepare
- The unit. A new monobloc heat pump or heat pump water heater, preferably on the RVO meldcode list. Keep the purchase invoice and the proof of payment.
- Spot and base ready, appliance delivered. The base is ready according to the installation manual: tiles, concrete footings or a sturdy wall, with the clearances and space for airflow and maintenance. The appliance has been delivered into the room or next to the spot; still packed is fine. We place or hang it, in consultation, € 90.00 per hour, per started quarter of an hour. Fit wall brackets, or a wall bracket for a wall-hung heat pump water heater, only in consultation with us; we check them on the photos and correct them where needed.
- Two 3-way valves with bypass. The flow and the return each have a 3-way ball valve, with a short piece of pipe (the bypass) between the two valves. For an outdoor unit they sit indoors, just behind the facade; for a heat pump water heater on the cold and hot water pipe at the water heater. With the valves set to bypass, the water of your home flows through the bypass and the appliance is shut off on both sides: your heating or hot water keeps working until we come. Set to appliance, the water flows through the heat pump or water heater and the bypass is shut off on both sides. So no stagnant piece of pipe stays attached to your installation, which helps against legionella. Set the valves to bypass before the appointment; we switch them over. How it works, with a drawing.
- Anti-freeze valves at the outdoor unit. After the 3-way valves, the flow and return run through the facade and end close to the unit’s water connections in two anti-freeze valves, at the lowest and coldest point. If the power fails during frost, these valves drain the outdoor section so nothing freezes. If the manufacturer prescribes glycol instead of anti-freeze valves, follow the manual. A heat pump water heater indoors does not need anti-freeze valves.
- Pipework. The pipes run up to and including the anti-freeze valves (for a heat pump water heater: up to and including the 3-way valves), in the diameter the manufacturer specifies, and the valves have the same connection size as the unit. We do not fit reducers: if the size is wrong, the preparation is not ready. We make the last connection with flexible hoses or multilayer pipe (such as Uponor); we do not bend or solder copper pipes. For a heat pump water heater we fit the inlet combination between the cold water valve and the water heater; it is charged as material and listed separately on your invoice. Do not insulate the hot water pipe to the taps.
- Marking is mandatory. Clearly mark every pipe at the anti-freeze valves and the 3-way valves with a label or coloured tape: flow (red) and return (blue), and for a heat pump water heater hot (red) and cold (blue). If the marking is missing or wrong, we have to trace the pipes; we charge that time as additional work.
- Filled, under pressure and leak-free. Your own pipework is already filled and at system pressure before the appointment, with the 3-way valves set to bypass, and does not leak. That way you test your own work days in advance. The section between the 3-way valves and the anti-freeze valves may still be empty; we fill it.
- Flushed and clean. New pipes have been flushed, free of solder residue, swarf or other dirt, with a dirt or magnetite filter if the manual prescribes one. Dirt in the system is your responsibility.
- Frost protection. You arrange it, in one of two ways: anti-freeze valves at the unit, or the whole installation filled with glycol, if the manufacturer allows it. With glycol: use propylene glycol, ready-mixed at the percentage from the manual (top up with the same mix, never with tap water), and fit no anti-freeze valves: during frost they would drain your glycol. With an open manifold or a buffer tank without a heat exchanger, the glycol is in the whole installation. State the product and percentage in your preparation; we measure it at handover and note it on the handover report. If frost protection is missing, we note it on the handover report and damage from freezing is at your risk.
- Isolator switch at the unit. Close to the unit there is a double-pole isolator switch on the power cable, so the installation can be switched off visibly and safely on the spot (NEN 1010). You fit the switch, connect a dedicated circuit in the fuse box and run the cable from that circuit up to and including the isolator switch (leave the circuit switched off). We connect the section from the isolator switch to the unit, and we check your circuit, RCD and fuse before switching on. Heat pump water heater with a plug (such as the Ariston Lydos)? Then an earthed socket within reach of the plug is enough; we still recommend a dedicated circuit. Two water heaters with plugs in cascade (for example two Lydos units) may share one circuit, if the manual allows it.
- Dedicated circuit and RCD. A dedicated circuit is connected in the fuse box: a circuit breaker behind an RCD, or an RCBO, with the rating the manufacturer specifies. If the manual requires its own residual current protection or a specific type (for example type A or B), it is fitted. At the appointment we check the circuit and carry out an RCD test. If it is not in order, we cannot continue. An old consumer unit with only fuse cartridges or without residual current protection must be renewed first; we do not connect anything to it.
- Condensate drain. There is a drain for condensate water at the spot of the unit.
- Accessible and safe. The spot with the delivered appliance, the anti-freeze valves, the 3-way valves, the isolator switch and the fuse box are clear and safely accessible.
- Parking. When booking or with your photo upload, let us know where we can park, and whether there is paid parking or a permit zone.
- For a hybrid heat pump: the 3-way valves sit in the pipe the manual prescribes (usually the return, before the boiler), so on bypass your heating simply keeps working until we come. There is a cable for the thermostat or OpenTherm connection between heat pump, boiler and thermostat. We do not work on the gas pipe or the boiler itself.
- Manuals. The installation and user manuals are ready (on paper or as PDF). If your heat pump uses an app, install it beforehand, create an account and make sure there is Wi-Fi reception at the unit (or indoor unit), with the Wi-Fi password at hand. Connecting the app is not part of the package; on request we do it on site for €49 extra. Check it yourself: take your phone, stand right next to the unit and see whether the Wi-Fi works well there. If you use an extender, leave it plugged in and switched on. If the Wi-Fi does not work at the unit on the day itself, we charge the extra time at our hourly rate. That easily adds up to an hour or more.
Dimensions
Stick to these dimensions and our connection hoses will always fit, so we are done quickly. If the installation manual of your heat pump says otherwise, follow the manual.
- Anti-freeze valves: 30 to 50 cm from the unit’s water connections, side by side at the same height, at the lowest point of the outdoor pipe and at least 20 cm above the ground, so they can drain freely. Put a “flow” and “return” label on the pipes.
- 3-way valves: indoors, just behind the facade, with the handles easy to reach and the bypass as short as possible. For a heat pump water heater: close to the cold and hot water connection of the water heater, with room for the inlet combination (about 25 cm) between the cold water valve and the water heater.
- Outdoors: the pipes insulated up to the anti-freeze valves, with insulation that can withstand sunlight and moisture.
- Isolator switch: within 1 metre of the unit, visible from the unit, at an easy-to-reach height. Leave about 50 cm of cable at the switch and at the unit.
- Condensate drain: directly below or right next to the unit’s condensate connection, with a fall.
Preparation kit
You buy what you need at an installation wholesaler or DIY store of your choice: two 3-way ball valves in the right size, a waterproof double-pole isolator switch, cable glands, condensate hose and labels. You fit them yourself following the dimensions above. We bring the connection hoses to the heat pump and the inlet combination of a heat pump water heater; they are charged as material. A complete preparation kit is coming soon at our sister shop Ampflow Energy.
Anti-freeze valves and a dirt or magnetite filter are not in the kit, because they differ per manufacturer and pipe size. The photo check is still needed.
What you do not do yourself
Do not connect the unit: no electrical connection from the isolator switch to the unit (and with a plug: not into the socket), and no water connection on the unit. Do not fill the system and do not switch the unit on. That is the installation, and we do that.
Is everything already connected?
If you want the ISDE grant, an installation company must install the heat pump. If you have already connected or filled it yourself, you have installed it yourself. We do not issue an installation invoice for ISDE for that, not even if everything is disconnected first. You can have it checked with our safety inspection for €99; that does not give a right to ISDE. If you want the grant, connect nothing and stop after the preparatory work.
Photos in advance
After booking, your date is provisional and you get a link to your personal page. There you tick off this list and send photos, at the latest 48 hours before the appointment. If it is not complete by then, we release your date for another customer; your reservation remains valid and you choose a new date as soon as everything is ready. Photograph the location with the base (and any wall bracket), the delivered appliance, the anti-freeze valves, the 3-way valves with the bypass, the isolator switch, the free circuit in the fuse box, the condensate drain, the marking on the pipes and the rating plate, so we already have the serial number. We let you know whether it is approved or what still needs to be done. Not sure what you may prepare yourself? We agree that together straight away. If it cannot be done for the fixed price, you get a full refund.
If something is still missing on site, we can do it as additional work with your agreement for € 90.00 per hour; materials are charged separately. If the situation is unsafe or cannot be connected, we cannot finish and the reservation is forfeited. See the terms and conditions, articles 4 and 6.